Grid Impact Study for Cox’s Bazar 60MW Wind Power Plant Project
Duration: September 2022 – March 2023
Location: Cox’s Bazar, Bangladesh
Client: US-DK Green Energy (BD) Limited
Steady State Analysis: · Load flow study · Short circuit study · Contingency study · Reactive power compensation Dynamic Analyses: · Transient stability · Fault ride-through control · Active power curtailment · Low voltage ride through · Frequency response Power Quality Analysis: · Harmonics analysis at POI