Grid Interconnections Study for proposed 1200MW RLNG Based Combined Cycle Power Plant Project as IPP.

Duration: February 2019 – March 2020 (Intermittent)

Location: Magnama, Cox’s Bazar, Bangladesh

Client: Consortium of PT Pertamina Power Indonesia, Marubeni Corporation and Intraco CNG Limited

Load flow study at different scenarios, Short Circuit Study, Dynamic power system model building of the proposed power plant including all power plant connected to Matarbari/ Magnama Power Hub, Plant performance under different contingencies, etc.