Projects: All (90)

Owner’s Engineer Services for Madhumati 100MW HFO Based Power Plant Project (including 132kV Single Circuit Transmission Line)
February 2018 – April 2019

Consultancy Services for Design and Supervision of Power Network and Gas Network for Bangabandhu Sheikh Mujib Shilpa Nagar (BSMSN) Development Project, BEZA
June 2023 – January 2024

Consultancy Services for Pre-Feasibility and Feasibility Study of Madhumati 100MW HFO Based Power Plant Project
August 2017 – November 2017

Technical and Financial Feasibility Study; Design and Drawings of Electrical Distribution Network; Design and Drawings of Gas Transmission Network - of Jolshiri Abashon Project
August 2018 – December 2020

Project Profile and Feasibility Study of a 5 MW Biomass Power Plant Project
June 2022 – September 2022

Feasibility Study for Electrical Interconnection Facility (EIF) and Gas Transportation Facility (GTF)
January 2023 – Ongoing

In-depth Monitoring of the “Construction of Narshingdi District Jail” Project. (Package: SR-25)
February 2023 – June 2023

Consultancy Services as Consultant (Energy) for Preparation of Mithamoin and Atpara Upazila (Package No.: UTMIDP/UMPP-1) Master Plan under "Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)”, LGED.
November 2023 - Ongoing

Consultancy Services as Consultant (Energy) for Preparation of Monoharganj, Lalmai and Gowainghat Upazila (Package No.: UTMIDP/UMPP-2) Master Plan under "Upazila Town (Non-Municipal) Master Plan Preparation and Basic Infrastructure Development Project (UTMIDP)", LGED.
November 2023 - Ongoing

In-depth Monitoring of the “Construction of 34 nos. Buffer Godown at Different Places of the Country for Facilitating Fertilizer Reservation and Distribution (1st Revised)” Project. (Package No.SR-27)
December 2023 - Ongoing

In-depth Monitoring of the "Development of Bhola (Parantalukdarhat)-Charfashan (Charmanika) Regional Highway" project
December 2023 - Ongoing

Grid Interconnections Study for proposed 1200MW RLNG Based Combined Cycle Power Plant Project as IPP.
February 2019 – March 2020 (Intermittent)

Grid Interconnection Study of Patuakhali 1320MW Coal Based Power Plant Project of RNPL
July 2019 – October 2020 (Intermittent)

Grid Study for the proposed 50MW Solar Power Plant Project of Scatec Solar ASA, Norway
May 2020 – July 2020

Grid Impact Study for Sirajganj 68MW Solar Park Project of Bangladesh China Renewable Energy Company (Pvt.) Limited (BCRECL)
July 2023 – ongoing

Technical and Financial Due Diligence for 576kW, 224kW, 324kW Rooftop Solar Power Plants respectively at Raz Cold Storage, Zayeda Cold Storage and Sarkar Cold Storage of Sarkar Group
March 2023 – August 2023

Environmental Impact Assessment and Hazard Identification and Risk Assessment at Tarasima Apparels Limited
July 2022 – September 2022

Environmental Impact Assessment and Hazard Identification and Risk Assessment at Cutting Edge Industries Limited
August 2022 – September 2022

Environmental Impact Assessment and Hazard Identification and Risk Assessment at APS Apparels (Dyeing Unit) Ltd.
August 2022 - November 2022

Environmental Impact Assessment and Hazard Identification and Risk Assessment at Scandex Textile Industries Limited
February 2023 – April 2023

Investment Grade Energy Audit at Agami Fashions Limited and Agami Washing Limited
November 2017 – December 2017

Investment Grade Energy Audit at Dekko Design Limited and Dekko Washing Limited
December 2018 – January 2019

Investment Grade Energy Audit at Smart Jacket (BD) Limited & Shehan Specialized Textile Mills Limited
November 2019 – December 2019

Investment Grade Energy Audit at Odessa Fashion Limited and Odessa Fashion Limited (Unit-2)
December 2020 – February 2021

Investment Grade Energy Audit at Meditex Industries Limited and Meditex Knitwear Limited
December 2020 – February 2021

Investment Grade Energy Audit at Titas Sweater Industries Limited and Titas Sweater (Knitting Unit)
December 2020 – February 2021

Technical Assessment on Improvement of Production Line Efficiency by Installing Automatic Data Processing Devices (ADPD) at Snowtex Outerwear Limited
February 2022

Green Supplier Programme: Energy Efficiency Assessment and Improvement Recommendations for IFS Texwear (Pvt.) Limited
February 2022 – July 2022

Green Supplier Programme: Energy Efficiency Assessment and Improvement Recommendations for Seasons Dresses Limited
February 2022 – July 2022

Green Supplier Programme: Energy Efficiency Assessment and Improvement Recommendations for Mayc’s Garments Limited
February 2022 – July 2022

Green Supplier Programme: Energy Efficiency Assessment and Improvement Recommendations for Amena (Pvt) Limited
February 2022 – July 2022

Energy Efficiency Assessment for the 425.7kWp Rooftop PV Solar Power Plant at Ananta Garments Ltd.
September 2023 – October 2023

Energy Efficiency assessment for Flamingo Fashion Ltd (DBL Group) for IPDC
December 2023 – January 2024

Electrical Safety Audit at Arif Knitspin Limited and, NRG Hometex Limited
September 2017 – October 2017

Electrical and Fire Safety Assessment at Active Distribution Ltd., Apex Husain Limited and East Asian Cox. (Pvt.) Ltd.
March 2021 – April 2021

Electrical System Design of Rawshan Jahan Eastern Medical College and Hospital
October 2017 – December 2017

Electrical System Design of the Cumilla Hospital (12 Storied Diagnostic & Hospital Building)
June 2018 – September 2018

Electrical System Design of Conference Hall and Gymnasium Buildings of UNHCR, Cox’s Bazar
November 2018 – December 2018

Mechanical, Electrical & Firefighting System Design of Concept Knitting Limited
February 2019 – December 2019

Electrical System Design of Old Dhaka Central Jail Museum (Zone B & Zone C) Project
March 2019 – December 2019

Electrical and Plumbing System Design of Barendra Vita Project of Sarkar Builders
January 2020 – February 2020

As-Built Design of Electrical System and proposed LPS and Earthing System Design and Firefighting Design of Active Distribution Ltd., Apex Husain Limited and East Asian Cox. (Pvt.) Ltd.
March 2021 – April 2021